Expansion warehouse with office Contecar Cartagena Fase 2

Thinking Steel INTERNATIONAL

Expansion warehouse with office

Shortly after accomplishing Cartagena phase 1, we realized phase 2: the            expansion of the warehouse and office. Another 10.000 m² is built directly      against the first warehouse, in mirror image and divided by a special fire wall.

Phase 2 includes:

2 additional floors on top of existing office

Special stairs made of steel with wooden steps

70 meter free span with special roof truss

16 loading docks and 2 overhead doors

PVC roof cover system with insulation

Building time: 16 weeks

  • Area warehouse

    10.000 m²

  • Area office second and third floor

    2.000 m² in total

  • Special

    Free span 70 m¹ in total

  • Treatment steel

    Hot dip galvanised

  • Remark

    Completely prefabricated