Expansion warehouse with office Contecar Cartagena Fase 2
Thinking Steel INTERNATIONAL
Expansion warehouse with office
Shortly after accomplishing Cartagena phase 1, we realized phase 2: the expansion of the warehouse and office. Another 10.000 m² is built directly against the first warehouse, in mirror image and divided by a special fire wall.
Phase 2 includes:
2 additional floors on top of existing office
Special stairs made of steel with wooden steps
70 meter free span with special roof truss
16 loading docks and 2 overhead doors
PVC roof cover system with insulation
Building time: 16 weeks
-
Area warehouse
10.000 m²
-
Area office second and third floor
2.000 m² in total
-
Special
Free span 70 m¹ in total
-
Treatment steel
Hot dip galvanised
-
Remark
Completely prefabricated