Multifunctional store Do It Phase 1
Thinking Steel INTERNATIONAL
Construction of a multifunctional store
A modern design on the outside, very light and spacious on the inside.
This store includes: loading area with two loading docks, automatic doors and fire partitioning walls, roof with 26 skylight domes for natural light and a PVC roof cover system.
The store is fully insulated.
Total building time: 12 weeks.
-
Area
8.000 m²
-
Treatment steel
Galvanized and coated
-
Remark
Completely prefabricated