Truck unloading platform Puerto de Mamonal
Truck unloading platform
A challenging project because of the height of the building (highest point over 28 meters) combined with the exposure to windspeeds up to 130 kph.
Our most qualified engineers built this platform in 6 weeks.
-
Area
950 m²