Warehouse including offices Drogueria INTI – Cedi Almabol

Thinking Steel INTERNATIONAL

New warehouse including offices

Design, steelconstruction, reinforced precast concrete plinth, PU coated wall
panels, fire resistant “cuarto inflamables”, roof system (steel deck, insulation
and FPO/TPO membrane) complete with rainwater discharges and overflows,
cage ladders, concrete hollow core slabs, stairs, doors (overhead, pedestrian,
fire proof sliding) and windows, canopy above entrance, dock levellers
complete with platform bumpers and dock shelters.

  • Area

    8.500 m²

  • Steel

    Approx. 365.000 kg

  • Assembly

    Assembly at a height of approx. 4.300 meter