Logistics centre Ericsson

Willemse COMPLEETBOUW

Logistic centre for high technical components

As leader of the building team Willemse Compleetbouw coordinated all    operations and developed and built the complete construction including offices.

The 2nd and 3rd floor are made of prefabricated steel with a wooden deck (“superfloor” antiskid).

 

  • Area

    8.000 m²

Contact us

Visit us

Vijfhuizenbaan 10, Gilze (NL)