Bottling Quaker Oats Gatorade
Thinking Steel INTERNATIONAL
Industrial building for a modern bottling plant
Resisting a wind speed of 165 km/hour and a seismic factor Zone C (C=0,64).
900.000 kgs of steel and about 30.000 m² FM approved panels were used in this factory which is 10 meters high.
A challenging order resulting in
a production area of 12.000 m²
approx 4.000 m² office space
and 2.500 m² canopies
plus loading platforms.
-
Area
18.500 m²
-
Special
The walls have been mounted on the inside of the steel construction which gives a very straight and smooth finish.