Headoffice Liebherr in Panama
INTERNATIONAL
Warehouse including workshop and offices
Design, engineering, steelconstruction, precast concrete plinth, precast
concrete hollow core slabs, wall panels, canopy outside warehouse,
aluminium frames windows and doors, pedestrian and overhead doors, stairs,
cage ladders, roof system (steel deck, insulation and PVC membrane)
complete with rainwater discharges and overflows.
2 pcs overhead cranes double girder, hoisting capacity 25.000 kg each complete with hoists and trolleys
2 pcs console cranes single girder, lifting capacity 5.000 kg each complete
with hoists and trolleys
Warehouse approx. 3.500 m²
Offices approx. 1.200 m²
-
Area
4.700 m²
-
Steel
Ca. 400.000 kg
-
Treatment steel
Pre-treatment of steel surface cleaning by grit blastingPolyester powder coating 1 layer